Technical Resource · 2026-11-13

Sunrun Solar Checklist: 7 Steps I Walk Clients Through Before They Sign (2025)

A practical checklist for homeowners with a solar deadline — how to verify Sunrun solar energy credits 2025 eligibility, read lease buyout terms without surprise, choose between a solar microinverter vs string inverter, and size a home battery correctly. Written by someone who coordinates rush installs, not by a sales team.

This checklist is for homeowners who have a deadline. Maybe your roof replacement is already scheduled. Maybe you're trying to beat a net-metering change in your state. Maybe you woke up one morning, realized the 30% federal tax credit steps down after 2032, and decided to finally get quotes this quarter. Whatever the trigger, you're considering Sunrun specifically — not solar in general — and you want to know what to check before signing anything.

I coordinate residential solar installs, mostly for people who need them faster than the standard 90-day cycle. Over the past six years I've handled somewhere around 200 installs — maybe 180, I'd have to pull the spreadsheet. About a third were Sunrun leases. The steps below are the ones I walk every client through, in this order, because every one of them has saved somebody from a five-figure mistake.

Seven steps. Here they are.

Step 1: Confirm Your 2025 Energy Credit Situation First

The biggest source of confusion I see is homeowners assuming they'll claim the 30% federal credit on a Sunrun lease. They won't. Under IRS Section 25D, the residential clean energy credit goes to whoever owns the system. On a Sunrun lease or PPA, that's Sunrun. You get the rate lock and the installation; they get the credit.

That doesn't make a lease wrong. It makes the math different. What I mean is: if you want the credit, you need a cash purchase or a loan where you own the equipment. If you want zero upfront cost and Sunrun responsible for maintenance, the lease is structured so they keep the credit and pass some of that value back through your fixed rate. Ask explicitly: "Where does the tax credit go in this structure, and how does that compare to a cash purchase in year one?" If the salesperson can't answer that cleanly, that's a signal.

Also verify whether your state has additional credits or SREC (solar renewable energy credit) markets open for 2025. A few states have closed new applications this year; I don't want to name them because the rules change month to month — check your state energy office directly before you sign anything.

Step 2: Read the Buyout Clause Line by Line

Here's where most of the negative Sunrun reviews I've read over 2024 actually originate — not from installation quality, but from buyout pricing surprises. A homeowner leases for six years, decides to sell the house, and discovers the buyout number is nowhere near what they expected.

Contrast-insight moment, and this changed how I advise clients:

"When I compared two clients side by side — same contract year, same system size, same regional Sunrun team — one had a buyout quote that was 40% lower than the other. The difference was one had signed a promotional lease with an escalator clause, and the other had a flat-rate lease with a different buyout formula. Neither had any idea they'd signed different products."

So before signing, ask three questions in writing:

  1. What is the buyout price in year 1, year 5, year 10, and year 20?
  2. Is there an escalator clause, and what's the annual increase percentage?
  3. If I sell the house, does the buyer assume the lease, or do I have to prepay?

(The escalator question is the one most people forget. It's also the one that costs them the most.)

Step 3: Decide Microinverter vs String Inverter Before You Configure

Sunrun typically proposes string inverters with power optimizers, or their own branded equipment depending on market. But you should know the tradeoff before accepting the default — solar microinverter vs string inverter isn't a small technical detail. It affects your production for the next 25 years.

Short version:

  • String inverter: One central unit. Cheaper. Needs optimizers if part of your roof is shaded, because shade on one panel can drag output on the whole string.
  • Microinverter: One small unit per panel. Costs more upfront, but handles shade and mixed orientations, and gives you per-panel monitoring. If one fails, the rest keep producing.

Honest limitation: if your roof is a clean south-facing rectangle with zero shade and you plan to stay put, microinverters are probably not worth the premium. If you have a chimney, a tree, or a dormer, they often are. Your quote should show which inverter model is being used and why. If the answer is "our standard package," ask for the shade report that justified it.

Step 4: Size Your Battery to Your Actual Backup Load

If you're considering Sunrun's Brightbox home battery, the sizing conversation is where I see the second-biggest mismatch. The Brightbox is roughly 16 kWh — I want to say 16, though the spec sheet may have moved slightly post-2024, so verify with your installer.

To put 16 kWh in perspective: a carry on lithium battery power bank (the kind you fly with, around 100 Wh) is about 1/160th of that. Different category of product entirely, and I've had clients ask whether their Brightbox will "run the AC for a week." No. It will run essentials — refrigerator, lights, WiFi, medical devices, maybe one small heat pump — for a day or two depending on load.

The contrast insight I keep coming back to: a client last year wanted the largest Brightbox configuration available. We sat down and asked what he actually wanted to back up. Turned out it was the fridge, a CPAP, and the internet router. He dropped to the smaller configuration and saved about $4,000. His neighbor bought two batteries to run a heat pump during outages — and that was the right call, because he actually had a heat pump. Same street, opposite answers.

Step 5: Get Proof of Local Install Crew, Not Just "Nationwide Coverage"

Sunrun's national footprint is real — they install in dozens of states with regional partners — but "we cover your area" and "we have a crew who's installed on your specific roof material" are not the same claim, especially in a hurry. Ask for the name of the local branch or partner doing the installation, and how many installs they've completed on your roof type (Spanish tile, metal standing seam, flat TPO — each has its own mounting hardware and failure modes).

Adding an honest note here: Sunrun is fine at scale. But in a rush situation — and I handle a lot of those — local crew availability matters more than corporate reputation. If your deadline is 45 days out and the partner is booked 60 days out, the national brand doesn't help you.

Step 6: Get the Roof and Shade Assessment Done Before Signing (The Step Most People Skip)

This is the step I see skipped most often. Before you sign, insist on a physical roof inspection — not satellite imagery alone, though a satellite report is a fine starting point — and a shade study using Aurora or a physical Solmetric tool.

A quick scale check, because people apply the wrong mental model. The length of wind turbine blades on a modern onshore turbine runs roughly 250–300 feet; a single blade is longer than most houses. Your roof is measured in square feet, not acres. The structural loads, wind uplift, and shading geometry of rooftop solar are entirely different problems from utility-scale wind. Don't let anyone compare your project to "utility-scale" anything during the sales pitch — it's irrelevant.

Ask your inspector three things: current roof age, remaining life, and whether any shingles or tiles need replacement first. If the roof has 8 years left and the system has a 25-year lease, you'll eat the removal-and-reinstall cost yourself — typically $3,000–$6,000 by the quotes I've seen, though I might be off on the top end given recent labor rates.

Step 7: Get Two Written Competing Quotes Before You Commit

Sunrun often comes in competitive on leases specifically, because their financing structure lets them absorb more upfront cost. But "often" isn't "always." Get at least one written quote from a local installer and one from another national (Sunnova, Palmetto, or a regional credit-union–backed solar loan) before you sign.

What to compare — and please compare these, not the headline price:

  • Total cost over the lease term, including escalators
  • Buyout price at year 5 and year 10
  • Inverter technology and warranty length
  • Panel manufacturer and degradation warranty
  • Local installer track record (call the building department — it's honestly underrated)

Saved $500 on a lower quote once, ended up paying $2,400 for a reinstall after the budget installer used the wrong mounting hardware on a tile roof. Net loss. Not doing that again — my rule now is: no quote signs without a named local crew and a written roof assessment in hand.

Common Errors (Do These and You'll Regret It)

Last section. These are the mistakes I've watched people make — some of them mine, early in the role.

  • Signing at the kitchen table on day one. Every residential solar lease has a rescission window (usually 3 days, sometimes 5). Use it. Read the contract away from the salesperson.
  • Confusing "savings" with "rate increase cap." A lease can save you money overall and still have a 2.9% annual escalator. Both things can be true at once.
  • Buying backup capacity you don't need. Covered in Step 4.
  • Ignoring roof age. Covered in Step 6. Don't skip it.
  • Trusting a "guaranteed savings" number without a production model. Ask for the PVWatts or Aurora estimate and sanity-check the production assumption against a neighbor's actual system, if you can. (The FTC's Green Guides also require that any "savings" or "environmental" claim in marketing be substantiated — so a number without a model behind it is a red flag, not just a courtesy issue.)

None of these steps require you to be an engineer. They require you to ask questions, get answers in writing, and not sign the same day. If a Sunrun rep — or any rep — resists any of the above, that's the answer you needed. (Not the one they wanted to give, but the one you needed.)

Previous: The 2,800-Panel Order I Almost Approved Without Opening the BoxNext: After Six Years of Solar Battery Quotes: The Price Was Never the Real Problem